Based on BXH-102, enhanced corrosion inhibition with improved low-temperature stability and anti-emulsification performance
| Project | Technical Indicators | Testing Standards/Methods |
|---|---|---|
| Appearance | Brown-red transparent liquid | Visual inspection |
| Solubility | Easily soluble in gasoline, diesel and heavy aromatics | Visual inspection |
| Density (20℃), g/cm³ | 0.95~1.05 | GB/T 2540 |
| Freezing point, ℃ | ≤-15 | GB/T 510 |
| Closed cup flash point, ℃ | ≥65 | GB/T 261 |
| Effective content, % | ≥95 | Solid content, 100℃ |
| Dimension | BXH-102 | BXH-105 |
|---|---|---|
| Effective content | ≥95% | ≥95% |
| Erosion resistance | Qualified | Excellent |
| Anti-emulsification | Average | Excellent |
| Low-temperature resistance | May precipitate | No precipitation |
| Oil solubility | Qualified | Excellent |
Based on the imidazoline intermediate BXH-102 synthesized from oleic acid and organic amines, one or more oleophilic/hydrophilic organic cyclic groups are added to improve low-temperature oil solubility. With hydrophilic groups, it is less prone to emulsification in the aqueous phase—short-term mutual solubility, then separating into oil and water phases on standing. Multiple cyclic groups better block contact between corrosive media and the metal surface; BXH-105 also improves corrosion inhibition, forms film quickly, and offers strong erosion resistance.
On the basis of the original imidazoline, one or more oleophilic/hydrophilic organic cyclic groups are added for a more advanced production process.
Solves low-temperature precipitation and poor oil solubility, allowing more cost-effective solvents to be selected.
Solves emulsification when oil-soluble products meet water, lowers application constraints, and broadens the applicable range.
Fast film formation and erosion resistance maintain pipeline wall protection and reduce CO₂/H₂S corrosion.
Sour water is prone to emulsification and oil carryover; BXH-105 keeps water clear and oil content on-spec.
Good low-temperature performance ensures normal winter application.
Film formation takes 4 hours to quickly contain abnormal corrosion and ensure stable operation of the device.